20/01/13: This is the point where I have completed my previous 'action plans' as I have looked into finishing the assigned taks for example, I have spoken about the; casting, locations, costume, make-up, props & lighting. I have also added pictures to show it visually as it's more clear also showing what we'll be adding in our 2-minute opening clip. Also, adding a video to show our inspirations and the areas in which we will be using in our video which is part of the 'research and planning'. Moreover, me and Rashmi have completed the script as this was our duty and we have successfully fulfilled our role as it's the script is clear and will therefore evidently aid us when doing our clip. Ashwaria had to do the storyboard once we did the script and she did. Drawing the shots and diverse scenes which will be taken place and saying how long each scene or shot will be taken place so it's clearer and time related.
Previous Action Plan: COMPLETED
Continue with further research and analyse from inspirations from for example, e4 teen prgrammes before the water-shed.
Research the actors we can possibly have by going to the drama group as we want our clip to be professional.
After script is done start on the storyboard straight away.
Email the ealing council to ask for permission in various of locaations.
Research different sound which can be suitable for A step back and aslo elements of sound during the clip.
Research on the title sequence look at different aspects in teen dramas which could inspire us on the clip.
Action Plan:
Show Mr Bush our storyboard, scripts and casting etc. See whether or not it's up to the preferred standard, and if he accepts it. If not make changes to what he think we could do
Keep looking at diverse E4 teen programmes for the title-sequence ideas (more)
Start shooting
No comments:
Post a Comment